Installation Manual

VSU28/35/45 — Vacuum Reflow Soldering Oven


⚠️ CAUTION! Unboxing and installation of the device requires minimum two persons.

Two person safety requirement
  • Electric screwdriver
  • Torx bit set
  • Hex key set
  • Wrenches 14, 17, 19
  • Spirit level

🔴 IMPORTANT: Unboxing shall be done on horizontal and even floor.


The step by step procedure is described below:

Open the crate starting with the removal of the top side. Take the individual parts out of the crate. One of the sides is intended to be used as a ramp. It is pre-assembled with ramp steps.

Use two of the vertical beams from the inner corners of the crate and fix them with screws on both sides of the ramp. These beams will protect the device from falling from the side of the ramp during unloading.

Crate with protective beams

Crate with protective beams

Place the ramp close to the crate base and attach it with brackets to prevent it from slipping away during unloading.

Secured ramp with brackets

Secured ramp with brackets

Step 4: Lift Device Feet and Remove Supporting Brackets

Section titled “Step 4: Lift Device Feet and Remove Supporting Brackets”

Unscrew and lift the feet of the device fully up using wrench 14. Remove the supporting brackets using hex key and wrench 17. The device will step onto its wheels.

Device feet and wheel adjustment

Device feet and wheel adjustment

Roll the device down the ramp

Rolling device down ramp

Rolling device down ramp

🔴 IMPORTANT: Heavy object. Risk of injury due to impact. Two persons at least are required for rolling the device down the ramp.

Step 6: Mount Display Pole and Connect Power

Section titled “Step 6: Mount Display Pole and Connect Power”

Mount the display pole and connect the power and cables. Plug the profile trenches using the provided covers.

Display pole and cable connections

Display pole and cable connections

Connection panel details

Connection panel details

Blow the device with compressed air gun to remove particles or dust from transportation.

Roll the device to its final position. Leave 30cm to obstacles on the left side of device.

Final device position with clearance

Final device position with clearance

Use a spirit level and 14mm wrench to adjust the height of feet and to level the device. Secure all four feet with 19mm nut against the profile.

Spirit level and foot adjustment

Spirit level and foot adjustment

💡 TIP: Align the spirit level along two diagonal feet and adjust these feet first. Then align the spirit level along the other diagonal and adjust the other two feet.


Not available in North America

CEE plug connection

CEE plug connection

  • Brown: Phase 1
  • Black: Phase 2
  • Grey: Phase 3
  • Blue: Neutral
  • Yellow/Green: PE (Protective Earth)

If CEE plug is available (EU only), connect to the appropriate receptacle on the wall.

10.2 North America - Connecting to Device Terminals

Section titled “10.2 North America - Connecting to Device Terminals”

Device is delivered without power cord. Following parts are required for installation the machine to facility mains:

  • Power cord 4x AWG 10 (Use copper conductors only)
  • Main switch, e.g. P1-32/EA/SVB from EATON
  • Main circuit breaker, e.g. FAZ-C32/3-NA from EATON
  • Power cord 4x AWG 6 (Use copper conductors only)
  • Main switch, e.g. P3-63/EA/SVB from EATON
  • Main circuit breaker, e.g. FAZ-C50/3-NA from EATON

Mount the components above in enclosure and connect to facility mains.

Inside the VSU electric control box connect the power cord to X1 terminal as shown in the image:

  • 1. Phase1
  • 2. Phase2
  • 3. Phase3
  • 4. PE
X1 terminal connections

X1 terminal connections

See schematic diagram provided with the system.


Step 11: Connect Extraction System (Aspiration)

Section titled “Step 11: Connect Extraction System (Aspiration)”

Connect an extraction hose over the exhaust ball check valve. Place and secure the Ø4mm tube for detection of aspiration inside the extraction system hose. The other end of the ventilation detection tube goes to the fitting on the back of the machine. See label “Aspiration sensor”. Also, provide extraction/aspiration at the discharge of the vacuum pump.

Extraction system diagram

Extraction system diagram

💡 TIP: Consolidate both exhausts (check valve and vacuum pump) together into one wider aspiration hose.

Consolidated extraction setup

Consolidated extraction setup


Connect gas supply tubes as follows:

  • Line1: 6mm PU tube, Nitrogen, pressure 5-6 bar
  • Line2: 6mm PU tube, Nitrogen, pressure 5-6 bar
  • Line3: 6mm PU tube, Nitrogen, pressure 5-6 bar
  • Line4: 6mm PU tube (optional), Nitrogen, pressure 5-6 bar
  • Compressed air: 6mm PU tube, pressure 5-6 bar, connection to nitrogen (e.g. together with cooling line is also possible)
  • Cooling line: 8mm PU tube, Nitrogen, pressure 5-6 bar
  • Aspiration sense: 4mm white PU tube included in the set. Connect to aspiration system
  • Pneumatic exhaust: 4mm white PU tube included in the set. Connect to aspiration system
  • Manual valve: The manual valve on the right side of panel is for adjusting the lifting speed of chamber lock screws.
Gas supply tube connections diagram

Gas supply tube connections diagram


Open the door of the formic acid compartment. Unhook the spring bottle fasteners. Remove the cap from the new formic acid bottle. Insert the suction tube from inside the full bottle and cap it. Place the bottle inside the box and fix it with the spring fasteners. Close the compartment door.

Formic acid bottle installation

Formic acid bottle installation

🔴 IMPORTANT: To manually activate auto refill from display, read section “Working with formic acid” in appendix A of User Manual.


Connect the device to PC using the Serial cable and USB-2-COM adapter from the set. Use connector labeled “RS232 to PC” on back panel.


Insert TC1 into the hole on the back side of graphite plate. Place the plate on the four feet in the chamber corners. Make sure the freely positional TC remains above the plate.

Graphite plate installation

Graphite plate installation